What is a record set of drawings?

What is a record set of drawings?

More Definitions of Record Drawings Record Drawings . A final set of drawings prepared by the Architect that incorporates all changes from all As-Builts, sketches, details, and clarifications. Sample 2.

What is Asbuilt drawing?

An as-built drawing is defined as a drawing created and submitted by a contractor after completing the project. As-built drawings are drawings that show all the minor and major modifications made by the contractor to the original drawing to provide an exact rendering of the project.

What is another term for record drawings?

What Is an “As-Built?” Also known as record drawings and red-line drawings, as-builts drawings are documents that allow a compare and contrast between the designed versus final specifications, and provide a detailed blueprint of the building and the land around it as actually constructed in the end.

What should be included in record drawings?

The drawings should show locations of all the mechanical, electrical and public health systems and components installed including ducts, pipes, cables, busbars, plant items, pumps, fans, valves, dampers, control devices, strainers, terminals, electrical switchgear and components, security and fire sensors and control …

Who prepares record drawing?

the architect
Record Drawings: Record drawings are prepared by the architect and reflect on-site changes the contractor noted in the as-built drawings. They are often compiled as a set of on-site changes made for the owner per the owner-architect contract.

Are record drawings the same as as builts?

As-Built vs. On the original construction documents and drawings, the as-built changes are made by the contractor in red ink. A record drawing is the final compiled drawing prepared by the architect himself/herself. These drawings mark the notes of the on-site changes that the contractor makes in the As-Built Drawings.

What is a red line drawing?

Red¬line drawings are hand written hard copies that record the changes which have occurred during construction phase of a project, these are usually manually incorporated onto the design drawings and writer in red, hence the name.

What is a the difference between a contract drawing and a record drawing?

As-built drawings are those prepared by the contractor as it constructs the project and upon which it documents the actual locations of the building components and changes to the original contract documents. Record drawings are those drawings prepared by the architect when contracted to do so.

When the metric system is used dimensions are written in?

When the metric system is used, dimensions are written in: Meters, centimeters, and millimeters. If the scale on a site plan reads SCALE: 1inch = 20′-0″, then every: Inch on the drawing represents 20 feet, 0 inches.

What is an example drawing number?

An example drawing Number using the above naming conventions would be: USB-NGB-Z1-01-D-M-5701 This Field will contain the unique project number. This number will be unique to the project and is independent of each individual organisation’s internal project numbers. The Unique number for this example is: USB

What is a a record drawing?

A record drawing is the final compiled drawing prepared by the architect himself/herself. These drawings mark the notes of the on-site changes that the contractor makes in the As-Built Drawings.

What is the project number of a drawing?

An example drawing Number using the above naming conventions would be: USB-NGB-Z1-01-DR-M-5701 This Field will contain the unique project number. This number will be unique to the project and is independent of each individual organisation’s internal project numbers.

What are the guidelines for recording as-built drawings?

If possible, As-Built Drawings should be recorded with three base colors using a standard legend: RED = deleted items, GREEN = added items, BLUE = special information or details. Refer to specific actions rather than referencing change-order numbers or related documents. The drawings should be a stand-alone package whenever possible.